The Funeral Home
Business Broker

Do you need a Phase I environmental report to buy a funeral home?

By , Business Advisor, HedgeStone Business Advisors · Last reviewed · 7 min read

Usually, yes. SBA lists death care services (NAICS 8122) as environmentally sensitive unless no embalming or cremation happens at the property, so an SBA loan secured by the building must start with a Phase I regardless of loan size. Even cash buyers should order one under ASTM E1527-21 to protect themselves from cleanup liability.

Key takeaways

  • SBA's SOP 50 10 8.1 requires a Phase I for death care properties that embalm or cremate, and it must follow the current ASTM standard, E1527-21.
  • EPA's All Appropriate Inquiries rule requires the inquiry within one year before acquisition, with key parts updated within 180 days; SBA accepts a report dated within one year of the loan number.
  • Funeral home risks center on prep-room drains and septic systems, heating-oil and fleet fuel tanks, and the site's earlier uses.
  • If the Phase I recommends a Phase II, an SBA lender must follow the environmental professional's recommendation or seek an exception, including housekeeping fixes such as sealing floor drains.

Environmental review sounds like a gas-station problem, and many funeral home buyers treat it as a formality. Lenders do not. Embalming, old heating systems, and decades of prior site use give death care property a specific risk profile, and SBA writes that profile into its rules.

This guide explains when a Phase I is required, what the consultant will look at in a funeral home, and what happens when the report finds something. Crematory air permits and emissions are a separate topic covered in our guide to evaluating a crematory.

Does every funeral home purchase need a Phase I?

Any SBA-financed purchase secured by the funeral home building does, if the property embalms or cremates. Conventional lenders usually ask too, and cash buyers have their own reason to order one.

SBA SOP 50 10 8.1 requires an environmental investigation of all commercial property offered as security, including through a mortgage or leasehold deed of trust. The lender must compare the property’s current and known prior uses against Appendix 6, which lists “8122 Death Care Services (unless no embalming or cremation at the Property).” Where the code matches, the investigation must begin with a Phase I regardless of loan amount. Ordinary properties can start with a cheaper questionnaire or records search; funeral homes cannot.

Cash buyers face a different risk. Federal cleanup law can reach a property’s current owner. A buyer who completes “all appropriate inquiries” before acquiring preserves the defenses available to owners who did not cause contamination, and a Phase I is how that inquiry is done.

What standard does a Phase I follow?

ASTM E1527-21, the standard EPA recognizes for the All Appropriate Inquiries rule and the one SBA names in its definition of a Phase I.

40 CFR 312.11 lists ASTM E1527-21 as a way to comply. The older E1527-13 version could be used only until Feb. 13, 2024, so a report on the old standard will not do. SBA’s SOP requires a Phase I conducted by an environmental professional under “the most recently adopted standard,” currently E1527-21, with an opinion on recognized environmental conditions.

Definition

Recognized environmental condition (REC): Under ASTM E1527-21, a finding that hazardous substances or petroleum products are present, have been released, or likely have been released at the property, or that conditions pose a material threat of a future release.

SBA adds its own demands. The Phase I must conclude either that the risk is so minimal no further investigation is warranted or that further investigation is needed. The environmental professional must be independent of the seller and borrower, carry at least $1 million in errors and omissions coverage, and sign SBA’s reliance letter.

What does a Phase I look for at a funeral home?

The same records, interviews, and site walk as any property, with extra attention to where preparation-room wastewater went and how the building was heated and fueled.

Funeral home features that draw a consultant’s attention
FeatureWhy it mattersWhat to have ready
Prep-room drainsEmbalming wastewater may have gone to a septic system rather than sewerPlumbing plans, sewer bills, permits
Septic system or drywellCan be a Class V injection well that received non-sanitary wastePumping records, location, state permits
Heating-oil tankOlder buildings often had one, sometimes abandoned in placeRemoval or closure records
Fleet fuel tankA motor-fuel tank for vehicles can be a regulated underground storage tankRegistration, leak detection, closure records
Prior site usesA former gas station, dry cleaner, or shop on the lotOld maps, deeds, city directories
Floor drains in garagesVehicle fluids can reach soilDrain discharge points

The septic question is specific to this industry. EPA Region 2’s Class V well closure guidance lists “funeral home waste disposal wells” as their own category and names phenol, 2-methylphenol, 4-methylphenol, formaldehyde, and copper as contaminants to sample. A firm that has always been on municipal sewer starts with an advantage.

Tanks need sorting. Under 40 CFR 280.12, the federal underground storage tank definition excludes a tank storing heating oil for use on the premises, which leaves those tanks to state rules. A buried motor-fuel tank for the fleet has no such exclusion. Either kind can still be a recognized environmental condition if it leaked.

When does a Phase I lead to a Phase II?

When the environmental professional finds a recognized environmental condition and recommends sampling. For an SBA loan, that recommendation is close to binding.

The SOP says that if the Phase I concludes further investigation is warranted and the lender still wants to make the loan, it must proceed as the professional recommends or ask SBA for an exception. SBA requires compliance with all recommendations, including “housekeeping measures” such as secondary containment and sealing floor drains. A Phase II follows ASTM E1903 and tests soil, groundwater, or septic contents. If it finds contamination and the lender still wants to lend, the professional must document whether it exceeds actionable levels, whether remediation is needed, an estimated cost, and a projected completion date. SBA does not allow approval or disbursement with known contamination unless the risk has been minimized to its satisfaction.

What does a Phase I not cover?

A standard Phase I looks for contamination of soil and groundwater from hazardous substances and petroleum. Several risks a funeral home buyer cares about sit outside that scope unless you add them.

Asbestos in old pipe insulation or floor tile, lead-based paint, radon, and mold are common “non-scope” items under the ASTM practice; ask the consultant to quote them separately if the building predates the 1980s. Indoor air in the preparation room is a workplace-safety question, not a Phase I question; formaldehyde exposure monitoring is covered in our guide to OSHA formaldehyde compliance. Building condition, roof life, and accessibility belong to a property inspection. Knowing the boundary keeps a clean Phase I from being read as a clean building.

How long does a Phase I take, and when should you order it?

In our experience, a few weeks for a clean report and much longer if a Phase II follows. Order it as soon as the LOI is signed and the seller allows a site visit.

Timing has two clocks. Under 40 CFR 312.20, the inquiry must be done within one year before acquisition, and interviews, lien searches, government records reviews, site visits, and the professional’s declaration within 180 days. SBA will accept a Phase I dated within one year of the loan number, but the SOP notes buyers may still want to meet EPA’s timeframes to keep their legal protections. If closing slips past six months, budget for an update.

  1. Sign the LOI with an environmental contingency and seller cooperation clause.
  2. Engage an environmental professional the lender accepts; confirm the reliance letter.
  3. Give the consultant plumbing, tank, septic, and permit records on day one.
  4. Review the draft for any recognized environmental conditions before it is final.
  5. If a Phase II is recommended, agree on scope, cost sharing, and an extended timeline in writing.

How should findings change the deal?

Turn each finding into a price change, a seller repair before closing, an escrow, or a specific indemnity. Leaving it vague hands the problem to you.

Worked example: a septic finding on an illustrative purchase

Inputs are made up. Agreed price: $1,600,000. The Phase I finds the prep room drained to an on-site septic system until the building connected to sewer in the 1990s.

  • Phase II sampling of the old tank and leach field: $12,000, split equally
  • Results show formaldehyde and phenol in tank sludge; the consultant recommends closure
  • Closure estimate: $28,000, plus 25% contingency = $35,000
  • Agreed fix: seller completes closure before closing, with $35,000 held back from proceeds until the state confirms closure
  • Buyer’s net effect: no price cut, but no unfunded cleanup risk

Bring the Phase I into the broader due diligence process and use our guide to negotiating with diligence findings to present it. The property side of the purchase is covered in buying a funeral home with real estate, the loan rules in our SBA loan guide, and the full sequence in the buyer’s guide.

Frequently asked questions

Do I need a Phase I if I am leasing the building, not buying it?

SBA's environmental rules attach to commercial property pledged as collateral, including through a leasehold mortgage, so a pure lease may not trigger the requirement. Your lender may still ask for one. As a tenant you can also be responsible for contamination you cause, so a baseline report protects you at move-out.

Can I use the seller's existing Phase I?

Rarely as is. SBA requires the environmental professional to be independent of the seller and to issue a reliance letter to the lender, and the report must be dated within a year of the loan number. A recent seller report can speed up a new one, because the consultant can update records and interviews instead of starting from nothing.

Does a funeral home that only does direct cremation off site need a Phase I?

SBA's list excludes death care properties with no embalming or cremation on site, so a firm that sends all preparation and cremation elsewhere may fall outside the automatic Phase I rule. The lender will still run its normal environmental steps, and past embalming at the property can still be a concern.

What happens if the report finds an old septic system that took embalming waste?

Expect the consultant to recommend sampling, and possibly closing the system under state and EPA underground injection rules. Price the work before closing: who pays, who hires the contractor, how long it takes, and whether the funeral home can keep operating while it is done.

Sources cited

  1. SOP 50 10 8.1: Lender and Development Company Loan Programs — U.S. Small Business Administration
  2. 40 CFR 312.11, References (All Appropriate Inquiries) — Electronic Code of Federal Regulations
  3. 40 CFR 312.20, All appropriate inquiries — Electronic Code of Federal Regulations
  4. Program Guidance for Voluntary Closures of Class V Wells without Individual Permits — U.S. Environmental Protection Agency, Region 2
  5. 40 CFR 280.12, Definitions (underground storage tanks) — Electronic Code of Federal Regulations
Book a call